Challenge 45 · starter · Rolling update

Rolling deployment failure

Four pods each run at 90% CPU at peak. At 10 seconds a rolling update to v2 starts with maxUnavailable 25% and maxSurge 0. New pods take 20 seconds to become ready.

From 10 to 150 seconds, answer at least 99% of requests and finish the rollout.

ready00:00 / 02:30Success · 10 s–p99 · 10 s–

Goal · measured 00:10–02:30

0 changes · par 2
  • Requests answered ≥ 99.0%not measured yet
  • Rollout complete ≥ 100%not measured yet

This is a simulation. Its numbers come from a model of a typical system, not from measuring real servers. The same link and seed always give the same run. How the Chaos Lab works.